Services

Electrical design services

Each service can be appointed on its own or as part of a full electrical design package.

E-01

Power & LV distribution

  • BS 7671:2018+A4:2026
  • LSZH cabling throughout
Illustrative drawing: Power & LV distribution

From the DNO supply to the last socket outlet. We assess maximum demand, select and coordinate protective devices, and verify every circuit by calculation so the design holds up when the contractor prices it and when the inspector tests it.

What's included

  • Maximum demand and diversity assessment
  • DNO new supply and capacity applications
  • Main switchgear and distribution board schedules
  • Busbar trunking and submain design
  • Cable calculations in ProDesign
  • AFDD, RCD and RCBO protection strategy
  • Containment routes and riser layouts
E-02

Lighting & emergency lighting

  • BS EN 12464-1
  • BS 5266-1:2025
  • BS EN 1838:2024
Illustrative drawing: Lighting & emergency lighting

Lighting designed to the task: lab benches, classrooms, open-plan offices and plant areas. Normal and emergency lighting are laid out together, with photometric calculations to show the levels and uniformity are achieved.

What's included

  • RELUX lighting calculations
  • Luminaire selection and schedules
  • Lighting control strategies
  • Emergency escape and open-area lighting
  • Exterior and car park lighting
E-03

Fire detection & alarm

  • BS 5839-1:2025
Illustrative drawing: Fire detection & alarm

We agree the system category with the client, fire engineer and insurer at the outset, record it in a design basis statement, then design the detection, sounders, interfaces and cause-and-effect to match.

What's included

  • Design basis statements
  • Detector and sounder layouts
  • Zone plans and cause-and-effect matrices
  • Interfaces with access control, AOVs and plant
  • Variations agreed and recorded
E-04

Laboratory & specialist

  • BS 7671 Part 7
Illustrative drawing: Laboratory & specialist

Laboratories bring their own demands: clean and dirty power, UPS-backed circuits, equipment loads that change with every tenant and specialist equipment with its own supply requirements.

What's included

  • Bench and service-spine power layouts
  • UPS and essential supplies
  • Leak detection systems
  • Derogations against landlord base-build requirements
E-05

Metering, energy & EV

  • CIBSE TM39
  • Approved Document L
Illustrative drawing: Metering, energy & EV

Metering that does more than satisfy Building Control. We set out what is metered and why, so landlords and tenants can see where energy goes, and plan EV charging around the real capacity of the supply.

What's included

  • CIBSE TM39 metering strategies
  • Part L metering compliance
  • EV charging infrastructure
  • Load assessments for added capacity
E-06

Specifications & CDM

  • CDM 2015
  • RIBA Plan of Work 2020
Illustrative drawing: Specifications & CDM

Clear specifications are what turn drawings into a priceable, buildable package. Alongside them we carry out our duties as a designer under CDM 2015 and support the project through construction.

What's included

  • Performance and prescriptive specifications
  • Designer's risk assessments and hazard registers
  • Tender support and query responses
  • Technical submittal reviews
  • Site inspections during construction
How appointments work

Involved at every RIBA stage

2

Concept design

Supply capacity, plant space, risers and the design strategy agreed with the team.

3

Spatial coordination

Layouts coordinated with the architect and mechanical engineer before detail begins.

4

Technical design

Calculated drawings, schedules and specifications, issued for tender or construction.

5

Construction

Technical submittal reviews, site queries and inspections through to completion.

Have a project that needs an electrical design?

Send the drawings or a short description of the scheme and we'll come back to you with any questions and a fee proposal.